Lake Huron water treatment in Goderich
Published by Water Network Research, Official research team of The Water Network in Case Studies
This virtual tour of the Goderich Water Treatment Plant is hosted by John Graham, Environmental Representative on the Ausable Bayfield Maitland Valley Drinking Water Source Protection Committee (SPC), and Project Manager with Veolia Water Canada Inc., and Cory Dulong, Senior Lead Operator. This video helps take viewers through the complex system from intake pipe, screening debris, initial treatment, filtering, chlorination and continual testing to distribution through the Goderich water system – an eight-hour process.
Tags
Category: Case Studies
- Wastewater Treatment Plant Design