Ecological Sequence Batch Reactor Wastewater Treatment Plant Installation Process (Video)

Published by in Case Studies

Ecological Sequence Batch Reactor Wastewater Treatment Plant Installation Process (Video)

Ecological Sequence Batch Reactor Wastewater Treatment Plant Installation Process (Video)

EcoTec EcoSBR plant with a capacity of 100 KLD is installed within 2 days by EcoTec technical expert with the help of 2 assistants at any site. The video shows how quickly EcoSBR sequencing batch reactor sewage treatment plant  can be installed, tested and commissioned.

Source: EcoTec Engineers and Consultants

Tags

Category: Case Studies