ID checking desing in Hungary (5554)
Published by WWTP Designs Research, Contributing Editors in Completed Designs
Your Activated Sludge Design project for Hungary (5554) is finished.
Influent parameters provided by the project designer:
| Project ID | 5554 |
| Project Name | ID checking desing |
| Country | Hungary |
You can access your documents using the following links:
Basic DesignProcess Scheme
P&ID
Equipment List
Instrumentation list
General Arrangement
Comparison Document
Tags
Category: Completed Designs
- 10001-50000
- Carbon removal
- Hungary
1 Comment
Please let me know How to join with this kind of project? We strongly recommend that you apply ELODE to your SLUDGE reduction project. Be sure to choose ELODE which guarantees 70%ds dehydration rate for the world's first, the cheapest driving cost in the world.
ELODE system is
① No Competitor! in the World for Sludge Dewatering~
② 30%wt(70%ds) Guarantee for most of WWTP sludge characteristics.
③ 0.25kWh/liter water removed! (Lowest Energy Consumption)!
④ 12months Recovery of Investment (Faster ROI)
⑤ World Lowest Operating Expenditure!
⑥ World Lowest Capital Expenditure!
For more information ... www.bluewin.kr
Published by Antonio KIM, MANAGING DIRECTOR at FINE INCORPORATION